Demolition, clean-up and waste removal in Varna

We demolish tiles, screeds and non-load-bearing walls, carry the waste out in bags and take it to a licensed waste facility. The site is left clean and ready for the next stage of the renovation.

Reply to your enquiry
24 h
Written warranty
2 yrs
Site visit and quote
Free

5.0 on Google · 15 reviews

Scope and approach

What you get

We work to a written list for each room – what is removed, what stays and how it is carried out. Before demolition, we switch off the power and shut off the water in the area, and we protect and clean the stairwell and lift every day.

Load-bearing walls, columns and beams are not touched without a structural engineer's opinion and the necessary permits. We plan noisy work according to the building's house rules and the municipal rules on quiet hours.

Technical detail: the volume of waste

Demolished material takes up more space than it did in the wall or floor – once broken up, it bulks out. That is why bags and truck runs are calculated from the actual volume of waste, not from the floor area of the home.

  • We demolish wall tiles, floor tiles, screeds, plaster and non-load-bearing partition walls according to the list
  • We remove baths, toilets, sinks, water heaters, kitchen cabinets, doors and frames
  • We take up parquet, laminate flooring, lino and carpet together with the underlays and skirting boards
  • We fill strong bags with the waste and carry it down the stairs, or in the lift if the rules allow
  • We protect the stairwell and lift and clean the common areas at the end of every working day
  • We take the waste to a licensed waste facility and leave the rooms swept and free of debris
When to call us

From the problem to the solution

The most common situations people call us about, and how we approach them.

Common problems

  • Demolition waste sits for days in the apartment or the entrance hall because no one takes it away
  • Neighbours complain about dust, noise and a dirty stairwell
  • A hidden pipe or cable is hit during demolition, causing an emergency
  • The quote includes the demolition but not carrying the waste out, taking it away and cleaning up
  • Construction waste is left next to the household bins and becomes a problem for the whole building

How we approach them

  • We demolish and carry out at the same pace, so waste does not pile up on site
  • We screen off the work area with plastic sheeting and plan noisy work within the permitted hours
  • Before demolition, we switch off the supply to the area and mark the likely routes of pipes and cables
  • In the quote we list the demolition as well as carrying out, waste removal and cleaning
  • We do not leave waste next to the household bins – we take it away on an agreed schedule

A good fit when

  • When you are starting a major renovation of an old apartment and everything has to be stripped back to the base
  • When you are renovating only a bathroom or kitchen and need the preparation stage
  • When you have bought a home and want to remove the old tiling, flooring and built-in cupboards
  • When you want one contractor for demolition, cleaning and waste removal instead of three

Process

How the work runs

We organise the work around the specifics of the city and the property, planning access, logistics and stages.

  1. We inspect the site and list what is removed, what stays and how much waste there will be

  2. We agree the days for noisy work according to the building's house rules and with the building manager

  3. We switch off the power, shut off the water in the area, cap the pipes and protect the common areas

  4. We demolish and remove, bagging the waste and carrying it out as we go

  5. We take the waste to a licensed waste facility, clean up and hand over the site ready for the next stage

Price

What affects the price

The price is set after a site visit, based on what is being demolished, how much waste it produces and how far it is to the truck.

If hidden layers or items not on the list turn up during demolition, we agree them with you before we continue.

See the price list
  • Tiles laid on mortar take longer to remove and produce more waste than tiles on adhesive
  • Terrazzo floors and reinforced screeds take more time than ordinary ones
  • The floor level and whether the lift can be used determine how long it takes to carry the waste out
  • The further from the entrance the truck has to stop, the more carrying by hand there is
  • Heavy items such as a cast-iron bath or an old water heater need more people and time
  • Working in an occupied home requires more protection and cleaning
Real properties

Completed projects

Our own projects with our own photos – see the level of detail and the finished result.

All projects

A written warranty

Every completed project receives a warranty certificate. This is what it covers and for how long.

2 years on all work
Construction, renovation and finishing work on the property.
6 years on plumbing, electrical and roofing work
Internal plumbing installations, electrical installations, roofing work and roof waterproofing — the areas where a hidden defect shows up late and costs the most.
Written certificate
Issued for every completed project, it sets out what is covered and for how long.

The extended term applies to the installations themselves and to the roofing work. Installed ready-made products — taps, fittings, appliances — carry the manufacturer's warranty.

What clients say

Rated 5.0 on Google

5.015 reviews on Google

Genuine reviews from RemontS clients on our Google profile. The clients wrote them in Bulgarian – the English is our translation.

All reviews on Google(opens in a new window)

Worked with us? Leave a review (opens in a new window) – we would appreciate it.

  • “Reliable guys, easy communication, work done quickly and to a high standard. I recommend them.”

    Mihaela S.January 2026 · Google reviewTranslated from Bulgarian
  • “If you're looking for tradespeople who work quickly, to a high standard and without any drama – these are your people! No ‘We'll come round tomorrow… or the day after…’, no headaches for you. They worked wonders with the renovation we needed and even left the place cleaner than they found it! In short – professionals with a capital ‘P’. I highly recommend them!”

    Vessy N.January 2025 · Google reviewTranslated from Bulgarian
  • “I highly recommend their services. Despite my fussiness, they kept to the deadline they had given and finished the bathroom renovation professionally, cleanly and meticulously.”

    Filip I.February 2025 · Google reviewTranslated from Bulgarian
  • “Great work, an extremely professional attitude, deadlines met and excellent workmanship.”

    Bilyana I.January 2025 · Google reviewTranslated from Bulgarian
  • “If you're looking for tradespeople, these are the right people. Fast, punctual and honest.”

    Ani D.January 2025 · Google reviewTranslated from Bulgarian
  • “I recommend them wholeheartedly! Very honest, fast and skilful!”

    Rosi S.January 2025 · Google reviewTranslated from Bulgarian
  • “Punctual and honest – I recommend them.”

    Tania T.January 2025 · Google reviewTranslated from Bulgarian
Questions and answers

Demolition, clean-up and waste removal in Varna: questions and answers

It includes demolition and removal according to the list, bagging the waste, carrying it out and taking it to a licensed waste facility, and cleaning the site. The rooms are left ready for the next stages of the renovation.

A partition wall – yes, once it is confirmed that it is not load-bearing. Load-bearing walls, columns and beams are not touched without a structural engineer's opinion and the necessary permits.

Noisy work is planned for the hours allowed by the building's house rules and municipal regulations. The stairwell and lift are protected, and the common areas are cleaned at the end of the day.

There is no need – waste removal is part of the service. For a large volume we can also arrange a skip, if there is space in front of the building and permission to place it.

The rooms where demolition takes place must be cleared of furniture and belongings. We seal the doors to the other rooms with plastic sheeting against dust.

Book a site visit and you will get demolition, waste removal and cleaning in one quote.

You can also send us photos of the rooms so we can prepare for the site visit in advance.

  • A site visit and technical clarification before we start
  • A written quote with a structured scope
  • A stage-by-stage work schedule