RemontS.bg
House in Bankya: skim coat, paint and a herringbone floor — Room after the renovation
— Case study —

House in Bankya: skim coat, paint and a herringbone floor

2024

Rooms in a house: skim coating and painting of the walls in a light warm tone, flooring laid in a herringbone pattern and skirting boards.

Property type

House

Year

2024

Photos

6

Gallery

The story of the project in photos

A detail of the work

Flooring laid in a herringbone pattern

A detail of the work

Room with access to the terrace

A detail of the work

The corner after the renovation

A detail of the work

Before the renovation

Final shot

Before the flooring was laid

Visual comparison

Before / after

This block shows not just the finished look, but the difference between the starting condition and the standard achieved.

House in Bankya: skim coat, paint and a herringbone floor — The same corner before and after the renovation
House in Bankya: skim coat, paint and a herringbone floor — The same corner before and after the renovation
Before
After

The same corner before and after the renovation

— Key takeaway —

An orderly process gives a better final result even before the last detail.

That is why we show every project as a real case study — not just a gallery of photos, but the logic behind the work.

— A similar project? —

Book a site visit and get a clear framework

Send us the details of the property and you will receive a specific next step — with no obligation.

Call us