−10%on every renovation for contracts signed by 31 Dec 2026
RemontS.bg
Finishing works

Tiling in Sofia

Free site visit and quote

Leave your phone – we will call you

+ Email and details (optional)

or +359 888 802 618 · Viber

−10% for contracts signed by 31 Dec 2026

By submitting you agree that we may contact you about your project. See our privacy policy.

We lay wall tiles, floor tiles and porcelain tiles in bathrooms, kitchens and living spaces – on a prepared base, with the layout planned before we start, straight grout lines and neatly finished corners and openings.

Reply to your enquiry
3–4 h
Written warranty · 6 yrs on plumbing, electrical and roofing
2 yrs
Site visit and quote
Free

5.0 on Google · 15 reviews

Scope and approach

What you get

The result is decided before the first tile goes on: the base must be flat, sound and primed, and in wet areas waterproofed. The layout determines where the tiling starts, so there are no narrow cut strips in visible places.

The adhesive is chosen to suit the tile and the base – porcelain tiles and large formats need an improved adhesive. In internal corners and around the bath we use silicone instead of grout, because there is movement there.

Technical detail: back-buttering

With porcelain tiles and large formats, adhesive is applied both to the base and to the back of the tile. That way no voids are left underneath – voids sound hollow and crack the tile under load.

  • Checking flatness with a straightedge and priming the base before tiling
  • A layout that puts the cut pieces in less noticeable places
  • Adhesive to suit the type and size of tile, with back-buttering for large formats
  • Levelling clips, so there are no steps between neighbouring tiles
  • Precise cut-outs for pipes, sockets and drains, and edges finished with a trim or a mitre
  • Grouting, silicone in the internal corners and cleaning of the tiled surfaces
When to call us

From the problem to the solution

The most common situations people call us about, and how we approach them.

Common problems

  • Tiles that sound hollow or crack on impact
  • Steps between neighbouring tiles and uneven grout lines
  • Narrow cut strips in visible places, for example by the door
  • Water that pools in the shower instead of draining to the floor drain
  • Darkened, cracked or crumbling grout

How we approach them

  • We apply adhesive with a notched trowel and, where needed, to the back of the tile as well
  • We check flatness with a straightedge during tiling, not only at the end
  • We set the starting point from the door or the centre of the wall, not from the first corner
  • We build the slope towards the drain into the base before tiling begins
  • We choose the grout to suit the area, and for the shower and kitchen splashback we suggest epoxy grout

A good fit when

  • When you are renovating a bathroom or toilet and need new wall and floor tiling
  • When you are laying porcelain tiles in a kitchen, hallway or living room
  • When you have chosen large-format tiles, which need a flat base
  • When you want a kitchen splashback or a single wall in tiles

Process

How the work runs

We organise the work around the specifics of the city and the property, planning access, logistics and stages.

  1. Site visit to check the base, measure the areas and agree the tiles, grout and laying pattern

  2. Levelling and priming the base and, in wet areas, waterproofing with tape in the corners

  3. Planning the layout and marking out the rows relative to the room's axes and the door

  4. Tiling with levelling clips, cutting and finishing the corners, openings and edges

  5. Grouting once the adhesive has set, silicone in the corners and cleaning

Price

What affects the price

The price is set after a site visit, because the tile size, the laying pattern and the condition of the base affect the labour more than the area itself.

The final cost is confirmed after a site visit and once the tiles have been chosen.

See the price list
  • Tile size – mosaics and large formats take more time
  • Type of material – wall tiles, floor tiles or porcelain tiles
  • Condition of the base and whether levelling or demolition is needed
  • Laying pattern – straight, diagonal, herringbone or with a border
  • Number of corners, openings, niches and edges with a trim or a mitre
  • Type of grout – cement-based or epoxy
Real properties

Completed projects

Our own projects with our own photos – see the level of detail and the finished result.

All projects
The RemontS promises

Six promises you can check

A renovation should not be stressful. This is what we do on every project — on paper and in front of you.

Book a free site visit
  1. A budget that does not change

    A written quote with the work, quantities and prices, then a contract for the same amount. Extra work starts only with your written consent and a price.

  2. You pay for work that is done

    Four instalments tied to the stages: 30% at signing, 30% after the rough work, 30% at 80% completion and the last 10% after you accept the property.

  3. A warranty on paper

    2 years' warranty on all work, 6 years on plumbing, electrical and roofing work, with a written certificate.

  4. Tested before it is closed

    New pipes are pressure-tested before they go into the wall. Waterproofing is tested with water before any tiles go on.

  5. Clean every day, handover with a record

    Waste leaves the site every day and never stays in the stairwell. At the end we walk the property together and hand it over with a signed handover record.

  6. One team, one contract

    Our own full-time team for plumbing, electrical work, tiling, plastering and painting. You do not have to find or coordinate separate tradesmen.

The first step is a free, no-obligation site visit. A colleague calls you within 3–4 hours during working hours (Mon–Fri 9:00–18:00, Sat 10:00–14:00).

A written warranty

Every completed project receives a warranty certificate. This is what it covers and for how long.

2 years on all work
Construction, renovation and finishing work on the property.
6 years on plumbing, electrical and roofing work
Internal plumbing installations, electrical installations, roofing work and roof waterproofing — the areas where a hidden defect shows up late and costs the most.
Written certificate
Issued for every completed project, it sets out what is covered and for how long.

The extended term applies to the installations themselves and to the roofing work. Installed ready-made products — taps, fittings, appliances — carry the manufacturer's warranty.

What clients say

Rated 5.0 on Google

5.015 reviews on Google

Genuine reviews from RemontS clients on our Google profile. The clients wrote them in Bulgarian – the English is our translation.

All reviews on Google(opens in a new window)

Worked with us? Leave a review (opens in a new window) – we would appreciate it.

  • “Reliable guys, easy communication, work done quickly and to a high standard. I recommend them.”

    Mihaela S.January 2026 · Google reviewTranslated from Bulgarian
  • “If you're looking for tradespeople who work quickly, to a high standard and without any drama – these are your people! No ‘We'll come round tomorrow… or the day after…’, no headaches for you. They worked wonders with the renovation we needed and even left the place cleaner than they found it! In short – professionals with a capital ‘P’. I highly recommend them!”

    Vessy N.January 2025 · Google reviewTranslated from Bulgarian
  • “I highly recommend their services. Despite my fussiness, they kept to the deadline they had given and finished the bathroom renovation professionally, cleanly and meticulously.”

    Filip I.February 2025 · Google reviewTranslated from Bulgarian
  • “Great work, an extremely professional attitude, deadlines met and excellent workmanship.”

    Bilyana I.January 2025 · Google reviewTranslated from Bulgarian
  • “If you're looking for tradespeople, these are the right people. Fast, punctual and honest.”

    Ani D.January 2025 · Google reviewTranslated from Bulgarian
  • “I recommend them wholeheartedly! Very honest, fast and skilful!”

    Rosi S.January 2025 · Google reviewTranslated from Bulgarian
  • “Punctual and honest – I recommend them.”

    Tania T.January 2025 · Google reviewTranslated from Bulgarian
Questions and answers

Tiling in Sofia: questions and answers

Sometimes – if the old tiles are firmly bonded, without cracks, and the higher level does not get in the way of the doors. They are then treated with a bonding primer, and any hollow or damp areas are removed.

Once the adhesive has set – the time is stated by the manufacturer and depends on the temperature. With standard adhesives, this is usually the next day.

For the walls and dry parts of the floor, a good cement-based grout is enough. In the shower and on a kitchen splashback, epoxy grout does not absorb water or dirt and is easier to clean.

Usually around 10% for straight laying and more for diagonal or herringbone. Buy the whole quantity at once and from one batch, because different batches vary in shade.

Yes – in the bathroom and shower area, waterproofing goes on before the tiles, with tape in the corners and sleeves around the pipes. In the quote it is listed as a separate stage.

Book a site visit and we will check the base before you buy the tiles.

You will receive a written quote based on the tile size, the laying pattern and the preparation of the base.

  • A site visit and technical clarification before we start
  • A written quote with a structured scope
  • A stage-by-stage work schedule