5 mistakes before a renovation starts – and how to avoid them
The most expensive renovation mistakes don’t happen while the work is under way – they happen before it starts. Here are the five most common, and what to do instead.

After more than a decade of renovation work, we see the same five mistakes again and again. They don’t happen during the renovation – they happen in the weeks before, while the client is still making the key decisions. Here they are, in order of cost.
Mistake one: rushing to start
Clients often want the renovation to start ‘next week’. Realistic planning – site visit, quote, contract, ordering materials – takes 3–4 weeks. When this phase is skipped, work begins without a precise plan, materials are ordered on the go and the delays come as a surprise. Better to push the start back by a month than to begin unprepared.
Mistake two: choosing a contractor on price alone
We get three quotes, the lowest is ‘€4,000 cheaper’, and we decide without looking at where the difference comes from. Often the low quote leaves out key work (plumbing alterations, drywall partitions, dust control and cleaning) that the others included. By the end of the project we pay the same or more, plus the extra stress of arrangements made piecemeal along the way.
Mistake three: relying on verbal agreements
‘We’ll sort it, don’t worry’ is the most dangerous sentence in renovation. Without a written contract and scope, every dispute halfway through the project comes down to ‘my word against yours’. Even if you find the ideal contractor, protect both sides with a written document – it makes the work easier, not harder.
Mistake four: leaving no buffer for unforeseen work
Old buildings always hold surprises – a corroded pipe, hidden damp, poor electrical wiring that cannot be left as it is. If you have left zero leeway in the budget, the first surprise means either halting the project or going into debt. The standard recommendation: a 10–15% buffer on top of the planned budget. Better not to spend it than to find yourself short.
Mistake five: not talking it through with your family
It sounds odd, but a renovation is a family project. If you live with a partner and children, each of them has an opinion on the layout, the colours, the kitchen. When these conversations don’t happen before the start, they happen in the middle of the project – usually in front of the tradespeople, usually with extra costs. Sit down together before you invite contractors in, and decide what you want.
Avoid these five mistakes and the project becomes predictable. Not problem-free – no renovation is problem-free – but manageable. And usually cheaper in the end.
More articles
All articles
Planning3 min read
Renovating a new-build home: from shell finish to turnkey
Bought an apartment in a new build? What to check at handover, the order in which the finishing work is done, and where time and money are most often lost.
Read
Planning3 min read
What a ‘full renovation’ of an apartment actually includes
Contractors often use the term differently. We set out the stages from strip-out to the final details, so you know exactly what to expect – and what to ask.
Read
Planning6 min read
Preparing for a summer renovation: when is the best time for demolition and renovation work?
Summer is almost here – the perfect time to make changes at home! But is it really the best season for demolition and renovation work? Many people believe the warm months offer ideal conditions for building work, but the truth is that every season has its advantages and its challenges. The weather plays a significant role in…
Read