How long does an apartment renovation take
A full apartment renovation usually takes 2–5 months, and the bathroom alone 2–4 weeks. The timeline depends above all on the scope – whether the installations are replaced – on the drying time of screeds and plaster, and on how many decisions have been made before the start.

Preparation, before the team moves in: a site visit, a written quote, the contract and ordering the materials with long delivery times – tiles, sanitaryware, doors, the kitchen. This phase is often underestimated. When it is skipped, the renovation starts without a plan and is already running late by the halfway point.
Strip-out: removing the old tiles, flooring and fittings, sometimes knocking down partition walls, and taking the waste away. This is where the real condition of the installations shows and where the ‘unforeseen’ work appears – corroded pipes, damp, old patch repairs. With us, extra work only starts after written approval and with a price.
Installations: new water pipes and drainage, new wiring and a consumer unit, testing. This is the most critical stage – a badly installed system can only be put right by breaking open finished walls and floors. That is why new pipes are pressure-tested before the wall is closed.
Walls, ceilings and screeds: plaster, plasterboard, skim coat, waterproofing in the wet rooms and self-levelling screed. Each layer needs time to dry, and this cannot be cut short without consequences for the result.
Floors and tiling: tiles in the bathroom, toilet and kitchen, laminate or parquet in the rooms. This is where the visible result takes shape, so the work is not rushed.
Finishing work: doors, sanitaryware and taps, switches, sockets and lighting, skirting boards and cleaning. At the end we go round the property together, put right any remarks and hand it over with a signed record.
What makes it take longer: a late delivery, changes in the middle of the renovation and hidden defects after the strip-out. That is why the stage-by-stage schedule is in the written quote – it shows when each stage finishes, and the move-in date is planned from the last stage, not from the first day.
More guides
All guides
Guide2 min read
How much does a bathroom renovation cost
How a bathroom renovation budget is put together, which factors affect the price most and how to compare quotes without being misled.
Read
Guide2 min read
How waterproofing is done
What matters in the preparation, the sequence of stages and the checks on critical details when waterproofing a bathroom, terrace or roof.
Read
Guide2 min read
How to choose a contractor
Practical criteria for choosing a contractor for your renovation and what you need to clarify right at the start.
Read