How much does a bathroom renovation cost

In 2026, a bathroom renovation costs roughly €4,000–6,000, including the labour and all the construction materials for the job. An old 4 m² bathroom at the standard level usually comes to €4,500–5,500. The real price depends on the condition of the plumbing and wiring, on the tiled area and on how complex the details are. You choose and buy the tiles, sanitaryware and taps yourself – they are not included in these amounts.

Free site visit and quote

Leave your phone – we will call you

+ Email and details (optional)

or +359 888 802 618 · Viber

−10% for contracts signed by 31 Dec 2026

By submitting you agree that we may contact you about your project. See our privacy policy.

Bright bathroom after a renovation, with beige tiles and a glass shower

Most of the labour in a bathroom comes from the tiles: the strip-out, preparing the walls, the waterproofing, tiling and grouting are priced per square metre of wall and floor. That is why a bathroom tiled up to the ceiling costs more than the same bathroom tiled halfway, and the floor area says little about the price.

You choose and buy the tiles and sanitaryware, and their price depends entirely on your choice – which is why they are not in our amounts. It helps to have them chosen before the start: the water outlets are placed and the tiling is planned according to them.

The second big item is the plumbing and electrical work – especially when the pipes are replaced, the shower or the toilet is moved, or a concealed shower or a wall-hung toilet is fitted. In an old bathroom the installations are usually as old as the building, and the renovation is the moment to replace them. That is why a site visit before the quote matters: it shows what is behind the old tiles.

The third item is waterproofing. It goes over the whole floor and the shower area, with tape in the corners and around the pipes, and is tested with water before any tiles go on. On our price list, applying waterproofing (floor and shower area) is €18.79 per m² and the waterproofing tape €10.74 per linear metre, both for labour.

An example from our price list: a 4 m² bathroom with a shower – strip-out, waterproofing, wall and floor tiles, a concealed shower with a linear drain, a wall-hung toilet, a vanity unit, a suspended ceiling and waste removal – comes to about €4,400 for labour alone. With all the construction materials, an old 4 m² bathroom usually comes to €4,500–5,500, and larger or more complex bathrooms up to €6,000. More on the bathroom renovation page.

When you compare bathroom quotes, ask specifically: which waterproofing is included and how it is tested, whether the pipes are replaced, what has been priced for the tiles and sanitaryware, whether waste removal is included, and what happens if a hidden problem turns up after the strip-out – mould, a corroded pipe, an uneven base. A quote that does not answer these questions is a rough figure, not a quote.

Our warranty is in writing: 24 months for all work, including the bathroom waterproofing, and 72 months for new plumbing and electrical installations. We offer a free site visit in Sofia, Plovdiv, Varna, Burgas, Pleven and Blagoevgrad, and afterwards you receive a written quote that sets out the scope, the construction materials on a separate line and the timeline.

The RemontS promises

Six promises you can check

A renovation should not be stressful. This is what we do on every project — on paper and in front of you.

Book a free site visit
  1. A budget that does not change

    A written quote with the work, quantities and prices, then a contract for the same amount. Extra work starts only with your written consent and a price.

  2. You pay for work that is done

    Four instalments tied to the stages: 30% at signing, 30% after the rough work, 30% at 80% completion and the last 10% after you accept the property.

  3. A warranty on paper

    2 years' warranty on all work, 6 years on plumbing, electrical and roofing work, with a written certificate.

  4. Tested before it is closed

    New pipes are pressure-tested before they go into the wall. Waterproofing is tested with water before any tiles go on.

  5. Clean every day, handover with a record

    Waste leaves the site every day and never stays in the stairwell. At the end we walk the property together and hand it over with a signed handover record.

  6. One team, one contract

    Our own full-time team for plumbing, electrical work, tiling, plastering and painting. You do not have to find or coordinate separate tradesmen.

The first step is a free, no-obligation site visit. A colleague calls you within 3–4 hours during working hours (Mon–Fri 9:00–18:00, Sat 10:00–14:00).

Ready for the next step? Book a site visit

The site visit and the written quote are free and with no obligation — we reply to your enquiry within 3–4 hours.

  • Free site visit
  • Written quote
  • Written warranty