−10%on every renovation for contracts signed by 31 Dec 2026
RemontS.bg
Back to the blog
Finishing work11 min read

Tiling: cost per m² by tile format and laying pattern

Tiling and grouting labour: €48.32 per m² on walls or floors, €64.42 in bathrooms, €80.53 in herringbone – plus preparation and strip-out, in two examples.

Free site visit and quote

Leave your phone – we will call you

+ Email and details (optional)

or +359 888 802 618 · Viber

−10% for contracts signed by 31 Dec 2026

By submitting you agree that we may contact you about your project. See our privacy policy.

Patterned tiles from our projects: a floor with a printed wood chevron, a bathroom wall with a chevron décor and a shower with hexagonal tiles

Tiling and grouting costs €48.32 per m² for labour according to our price list – the same for walls and floors. In a bathroom or toilet room, the price is €64.42 per m², and for a floor laid in herringbone €80.53 per m², also for labour. The prices are as of October 2026 and may change.

Something else is almost always added to the tiling: removing old tiles, preparing the base, edges, skirting boards or tile skirting. That is why a 4 m² kitchen splashback comes to €204.00 for labour on a sound wall, and €343.60 for labour if old tiles have to be removed and the wall straightened first. The calculations are below.

You choose and buy the tiles yourself. The adhesive, grout, primer and mesh are construction materials – they are in our quote, on a separate line from the labour.

Labour prices item by item

The names are as in the price list. Where an item says ‘Tiling and grouting’, the grouting is included in the price per square metre.

TaskLabour price
Tiling and grouting, walls€48.32 per m²
Tiling and grouting, floor€48.32 per m²
Tiling and grouting (walls and floor)€64.42 per m²
Tiling and grouting, floor (herringbone)€80.53 per m²
Laying stone, floor€48.32 per m²
Fixing large-format tiles on walls€300.64 each
Regrouting€16.11 per m²
Preparing walls for tiling – primer€2.68 per m²
Preparing walls for tiling – plasterboard/plaster€23.00 per m²
Preparation for tiling – plaster€18.79 per m²
Preparing walls for tiling – plaster + mesh€21.47 per m²
Removing tiles (walls + floor)€16.11 per m²
Removing tile skirting€8.05 per lin. m
Tile skirting€13.42 per lin. m
Fitting tile skirting€24.16 per lin. m
Fitting stone skirting€59.05 per lin. m
Labour prices as of October 2026; tiles and construction materials are not included. The current prices are in the price list.

Edges, openings and thresholds are separate items – priced per linear metre or per item:

  • corner trim on external edges (‘Fitting corner trim’) – €18.79 per linear metre for labour;
  • tiling window reveals or a sill – €37.58 per linear metre for labour;
  • lining a niche with tiles – €107.37 per item for labour;
  • tiling a threshold – €53.69 per item for labour, and fitting a threshold in a shower area – €64.42 for labour;
  • silicone in the corners (‘Applying silicone in the corners’) – €64.42 per item for labour.

Why bathrooms, herringbone and large formats cost more

The labour depends not on the price of the tile, but on how much cutting and precision it needs. The quickest to lay is a rectangular medium-format tile, laid straight on a flat base. Any departure from this – a small room with lots of corners, laying at an angle, a large size – adds time.

Bathrooms and toilet rooms

For bathrooms and toilet rooms, the price list has a separate item for walls and floor – €64.42 per m² for labour. The room is small and there is a lot of cutting: around the pipes, the drain, the corners and the niches, and the floor tiles follow the fall towards the drain. For a bathroom with a 4 m² floor and walls tiled up to the ceiling, the tiles come to about 26 m²: 26 m² × €64.42 = €1,674.92 for labour.

The full costing for a bathroom like this – with the strip-out, the waterproofing and the installation of the sanitaryware – is in the article bathroom renovation: labour costs task by task, and how we work on bathrooms is on the bathroom renovation page.

Herringbone

In a herringbone pattern, each tile is laid at an angle to the next, and the laying starts from a centre line in the middle of the room. Along every wall the tiles are cut at an angle, so there are more offcuts and more waste. According to the price list, a floor like this is €80.53 per m² for labour – €32.21 more than a standard one (€80.53 − €48.32 = €32.21).

A herringbone or chevron design, however, can also be printed on the tile itself. The tiles are then laid in a straight grid, and the pattern is matched from tile to tile. The price list has no separate item for patterned tiles – the price per m² depends on whether it is a wall, a floor or a bathroom, and on how the tiles are laid.

An empty room with a floor of large wood-effect tiles with a chevron pattern; the joints between the tiles run in straight lines, there are skirting boards along the walls, and at the far end a window and a glazed door
A bathroom wall with white decorative tiles in a chevron pattern, a round mirror, a basin on a white vanity unit and a floor-standing toilet; the wall on the left has wood-effect tiles
A shower enclosure with a glass door: inside the shower, the walls have tiles with a hexagon pattern, and outside it large grey stone-effect tiles; there is a linear drain in the floor, and an access panel and a toilet on the left
The pattern is in the tiles themselves: a floor in a house in Bankya (left), a chevron-pattern wall in a bathroom with wood-effect tiles (centre) and a shower in a grey bathroom with hexagon-pattern tiles (right). In all three photos, the joints run in straight lines through the pattern.

Large format and mosaic

Large tiles give a wall or floor with few joints, but they take more work. The base has to be very flat, otherwise neighbouring tiles end up at different heights or sound hollow. Adhesive is applied both to the base and to the back of the tile, and the heaviest slabs take two people to move. Around pipes, sockets and corners, every cut is longer and riskier.

Large-format tiles on walls are a separate item – €300.64 per slab for labour; how many slabs there are depends on their size and on the size of the walls, and is worked out in the quote. There is no separate item for mosaic or diagonal laying – the price for these is agreed after the site visit.

What large format looks like in a small bathroom, and when it is worth it there, we show in the article small bathrooms of 2–4 m²: ideas and cost.

Preparation and strip-out

A tile is only as straight as the base beneath it. Adhesive does not straighten a crooked wall: unevenness is corrected before tiling, which is why preparation is a separate item.

For walls, the price list has four levels. If the wall is sound and flat, primer is enough – €2.68 per m² for labour. If the plaster is old, crumbling or crooked, new plaster goes on – from €18.79 to €23.00 per m² for labour, depending on the condition. For a 10 m² wall, that is the difference between 10 m² × €2.68 = €26.80 and 10 m² × €23.00 = €230.00 for labour.

The floor has to be level, sound and dry. If the old screed is cracked or uneven, a new one is laid – for example, ‘Mesh + floor screed up to 3 cm’ is €13.42 per m² for labour. In a bathroom, there is also waterproofing under the tiles, with tape in the corners, and it is tested with water before tiling.

Old tiles are broken out – ‘Removing tiles (walls + floor)’ is €16.11 per m² for labour, and taking the waste to a disposal site is €110.00 per trip, also for labour. How the strip-out works and what turns up under old tiles is covered in the article bathroom and wall demolition.

Worked example: a 4 m² kitchen splashback

The kitchen splashback between the worktop and the wall cabinets is a typical small tiling job. If there are old tiles on the wall, they are removed, the wall is straightened with plaster and mesh, and the new tiles go on:

TaskQuantityLabour price
Removing tiles (walls + floor): €16.11 per m²4 m²€64.44
Preparing walls for tiling – plaster + mesh: €21.47 per m²4 m²€85.88
Tiling and grouting, walls: €48.32 per m²4 m²€193.28
Total€343.60
Labour only, based on the price list as of October 2026. Tiles, adhesive and grout are not included.

Total: €64.44 + €85.88 + €193.28 = €343.60 for labour. If the kitchen is new and the wall is sound, with no old tiles, there is no tile removal or plastering. That leaves the primer – 4 m² × €2.68 = €10.72 – and the tiling, €10.72 + €193.28 = €204.00 for labour in total.

Sockets on the splashback are removed before tiling and refitted afterwards – ‘Removing and refitting a socket’ is €11.00 per item for labour. A whole kitchen – plumbing and electrics, walls, floor and splashback – is costed in the article kitchen renovation: labour costs task by task.

Worked example: a 20 m² living room floor

A 4 × 5 m room with a new porcelain tile floor on a sound, level base. There are skirting boards along the walls – as in the house in Bankya in the photos below. The perimeter of the room, minus the doorway, is about 17 m.

TaskQuantityLabour price
Tiling and grouting, floor: €48.32 per m²20 m²€966.40
Fitting skirting boards: €4.29 per lin. m17 lin. m€72.93
Total€1,039.33
Labour only, based on the price list as of October 2026. Tiles, skirting boards and construction materials are not included.

Total: €966.40 + €72.93 = €1,039.33 for labour. The figure changes if:

  • old parquet has to come up – ‘Removing floor covering/parquet’: 20 m² × €6.98 = €139.60 for labour, or for laminate flooring, ‘Removing laminate flooring’: 20 m² × €3.22 = €64.40 for labour;
  • the base is uneven and a new screed is laid – with ‘Mesh + floor screed up to 3 cm’, that is 20 m² × €13.42 = €268.40 for labour;
  • the floor is laid in herringbone – 20 m² × €80.53 = €1,610.60 instead of €966.40, i.e. €644.20 more for labour;
  • there is tile skirting along the walls instead of skirting boards – the price list has two items for it per linear metre, ‘Tile skirting’ (€13.42) and ‘Fitting tile skirting’ (€24.16), for labour; which one applies to your floor is specified in the quote;
  • the building has no lift – ‘Carrying tiles and sanitaryware upstairs’ is €91.27 for labour.
A room during the renovation: a concrete floor, white walls, a window with three casements, a wooden stepladder, bags of dry mix, a bucket and a drill with a mixing paddle
An empty room with a floor of large marble-effect tiles, pale yellow walls and a white window with three casements; there are white skirting boards along the walls
The corner of a room: marble-effect floor tiles, white skirting boards along both walls and a wood-effect door leaf
House in Bankya: a room before the floor was laid (left), a marble-effect porcelain tile floor (centre) and a corner with the skirting boards by the door (right).

How the tiling is done

A good tiling job is decided before the first tile goes on. The order of work is:

  1. Site visit and measuring: the flatness, soundness and moisture of the base are checked, and the tiles, the grout and the laying pattern are agreed.
  2. Preparation: removing old tiles, straightening the walls, screeding the floor, priming and, in wet areas, waterproofing that is tested with water.
  3. Setting out: deciding where the laying starts, so that the cut strips end up in inconspicuous places rather than by the door.
  4. Tiling with a notched trowel; with large tiles, adhesive is also applied to their backs, and levelling clips keep neighbouring tiles at the same height.
  5. Grouting once the adhesive has set (the time is in the manufacturer’s instructions), silicone in the internal corners and around the bath, and corner trims on the external edges.
A bathroom during tiling: walls with beige tiles and leaf-pattern decor tiles, an open window and new beige tiles on the floor; the bottom of the walls has no tiles yet and the grey waterproofing shows, and a long spirit level leans against the wall
A bathroom in Knyazhevo during tiling: the walls are tiled and the floor tiles are being laid, but the bottom row on the walls is still missing – below it you can see the waterproofing and the tape. On the left, in the floor, is the linear drain.

The photo shows the order in this bathroom: first the walls, then the floor, and the bottom row on the walls last, so that the wall tiles sit on the floor tiles. How we tile and which adhesives we use is also described on our tiling page.

Frequently asked questions

Is grouting charged separately?

No – for the ‘Tiling and grouting’ items, the grouting is included in the price per square metre. Silicone in the corners and regrouting old joints are separate items.

Can new tiles go over old ones?

Sometimes – if the old tiles are firmly bonded and flat, with no hollow spots or cracks, and the higher level does not get in the way of the doors and the threshold. The surface is then cleaned and treated with a bonding primer – ‘Concrete bonding primer’ is €3.00 per m² for labour. Whether the base is suitable is decided at the site visit. In a bathroom, the waterproofing is redone along with the tiles, so there the old tiles are usually broken out.

How many spare tiles should we buy?

As many as the cutting requires – more for herringbone, diagonal and large-format laying, fewer for straight laying in a rectangular room. The exact quantity comes from the setting-out, so it is best to order the tiles after the site visit. Buy them all from the same batch – different batches vary in shade – and keep a few tiles for repairs in years to come.

When can you walk on new tiles?

Once the adhesive has gained strength – the time is in the manufacturer’s instructions and depends on the adhesive and the temperature. Until then the floor is not loaded, and the grouting also waits for the adhesive. If time matters, there are rapid-setting adhesives; the choice is agreed in the quote.

Who buys the adhesive and grout?

We do – they are construction materials and are in our quote, on a separate line from the labour, together with the primers, mesh and waterproofing. You choose and buy the tiles. It is a good idea to choose the grout colour at the same time.

How much does it cost just to redo the grout?

If the tiles are sound and well bonded but the grout has darkened or is crumbling, regrouting is enough – €16.11 per m² for labour: the old grout is raked out and the joints are grouted again. If the tiles sound hollow or there is moisture behind them, regrouting will not solve the problem.

If you would like an exact price for your walls and floor, book a site visit – it is free, and afterwards you receive a written quote with the work described and priced. The site visit is most useful before you buy the tiles: the setting-out and the quantity will then be worked out for the actual room. We reply to enquiries within 3–4 hours.

The RemontS promises

Six promises you can check

A renovation should not be stressful. This is what we do on every project — on paper and in front of you.

Book a free site visit
  1. A budget that does not change

    A written quote with the work, quantities and prices, then a contract for the same amount. Extra work starts only with your written consent and a price.

  2. You pay for work that is done

    Four instalments tied to the stages: 30% at signing, 30% after the rough work, 30% at 80% completion and the last 10% after you accept the property.

  3. A warranty on paper

    2 years' warranty on all work, 6 years on plumbing, electrical and roofing work, with a written certificate.

  4. Tested before it is closed

    New pipes are pressure-tested before they go into the wall. Waterproofing is tested with water before any tiles go on.

  5. Clean every day, handover with a record

    Waste leaves the site every day and never stays in the stairwell. At the end we walk the property together and hand it over with a signed handover record.

  6. One team, one contract

    Our own full-time team for plumbing, electrical work, tiling, plastering and painting. You do not have to find or coordinate separate tradesmen.

The first step is a free, no-obligation site visit. A colleague calls you within 3–4 hours during working hours (Mon–Fri 9:00–18:00, Sat 10:00–14:00).

— Ready for a project? —

Book a site visit — reply within 3–4 hours

Briefly describe the property and you will receive a specific next step — with no obligation.

Enquiry

Tell us a bit about your project

One clear form, with no steps and no unnecessary questions. Send the main details and you will receive a personal reply.

Reply within 3–4 hoursA clear first outlineNo unnecessary steps
+ More details (optional)Not required — fill in only if you want a more precise reply.

By submitting you agree that we may contact you about your project. See our privacy policy.

Reply within 3–4 hours
Free site visit
Experience since 2019